Installation & Commissioning
On-site installation, utility connection, water trial, milk trial and operator training — handover only after a signed performance test.
On-site installation, utility connection, water trial, milk trial and operator training — handover only after a signed performance test.
From specification to lifetime service
Every machine moves through a measured five-step lifecycle — engineered, validated and supported in-Kingdom.
-
01
Design
Process engineering, sizing (LPH), P&ID, hygienic-design layout and material selection (AISI 316L).
SLA · 5–10 days -
02
Manufacture
In-house fabrication: plate/tubular heat exchangers, holding tubes, CIP circuit, electrical and PLC build.
SLA · 6–12 weeks -
03
Install
On-site mechanical, electrical and utilities tie-in by our installation crew — anywhere in the Kingdom.
SLA · < 14 days -
04
Commission
Cold and hot commissioning, holding-time validation, CIP verification, operator training and SFDA dossier.
SLA · FAT + SAT -
05
Service
Preventive maintenance contracts, calibration, OEM spare parts and a 24-hour KSA-wide response window.
SLA · < 24 hr
Ready for installation & commissioning?
We return a tailored proposal within one business day.