Skip to content
TechnoSmart
Home / Products & Services / Installation & Commissioning
Service

Installation & Commissioning

On-site installation, utility connection, water trial, milk trial and operator training — handover only after a signed performance test.

On-site installation, utility connection, water trial, milk trial and operator training — handover only after a signed performance test.

How we operate

From specification to lifetime service

Every machine moves through a measured five-step lifecycle — engineered, validated and supported in-Kingdom.

  1. 01

    Design

    Process engineering, sizing (LPH), P&ID, hygienic-design layout and material selection (AISI 316L).

    SLA · 5–10 days
  2. 02

    Manufacture

    In-house fabrication: plate/tubular heat exchangers, holding tubes, CIP circuit, electrical and PLC build.

    SLA · 6–12 weeks
  3. 03

    Install

    On-site mechanical, electrical and utilities tie-in by our installation crew — anywhere in the Kingdom.

    SLA · < 14 days
  4. 04

    Commission

    Cold and hot commissioning, holding-time validation, CIP verification, operator training and SFDA dossier.

    SLA · FAT + SAT
  5. 05

    Service

    Preventive maintenance contracts, calibration, OEM spare parts and a 24-hour KSA-wide response window.

    SLA · < 24 hr

Ready for installation & commissioning?

We return a tailored proposal within one business day.

Chat on WhatsApp